top of page

Sikalastic® -110 | Bituminous Waterproofing (20kg)

Brand : Sika

Product Type : High elasticity, one part polyurethane bituminous waterproofing coating

Size : 20kg

Color : Black

Composition : Polyurethane bituminous hybrid

Density : 1.08 kg/L

 

Product Description :
Sikalastic®-110 is a water based one part modified polyurethane/bituminous coating, formulated to form a highly elastic, seamless and crack bridging membrane.

 

Usage:

Due to its high elasticity, Sikalastic®-110 can be applied on different structures including those subject to thermal movement and vibration such as:

  • Concealed RC flat roof
  • External walls to be buried below ground
  • Waterproofing coating under tiles areas like podium, balconies and etc.

 

Features / Advantages:

  • Easy application by roller, brush or sprayed, even onto vertical walls and ceiling
  • High elasticity
  • High crack bridging capability
  • Optimum adhesion onto concrete
  • Can be applied directly on damp surface
  • Non-toxic
  • Low VOC and eco-friendly

 

Shelf Life:

12 months from date of production

 

Storage Conditions:

Store properly in original, unopened, undamaged sealed packaging in dry condition at temperature between +5 °C and +30 °C. Protect from direct sunlight.

 

System Information:

Standard Coating System Consumption:

  • Primer (Consumption : ~0.2 kg/m²) - dilute with 1 part clean water
  • First Coat (Consumption : ~0.65 kg/m²)
  • Second Coat (Consumption : ~0.65 kg/m²)

 

Reinforced Coating System Consumption:

  • Primer (Consumption : ~0.2 kg/m²) - dilute with 1 part clean water
  • First Coat (Consumption : ~0.8 kg/m²)
  • Reinforcement Sika Reemat Premium-120 (1 layer)
  • Second Coat (Consumption : ~0.5 kg/m²)
  • Third Coat (Consumption : ~0.5 kg/m²)

 

Technical Information:

  • Tensile Strength : ~1.5 N/mm² (without reinforcement)
  • Elongation at break : ~1000 % (Without reinforcement)

 

Application Guide:

  • Substrate Temperature : +5 °C min. / +40 °C max.
  • Dew Point : The substrate and uncured membrane temperature must be at least 3 °C above the dew point to reduce the risk of condensation or blooming on the membrane finish.
  • Substrate Moisture Content : < 6 % pbw
  • Curing Time : 48 hours min. to full cure (at +25 °C)
  • Waiting Time:
    • After primer : 30–60 min min. ; 2 days max. (+30 °C)
    • Between Coats : 4-8 hours min. ; 2 days max (+30 °C)
  • Applied Product Ready for Use
    • Sikalastic®-110 should be allowed to cure for min. 48 hours prior to overlaying with screed.

 

Application Steps:

Step 1 : Substrate Preparation

  • New concrete should be cured at least 28 days and should have a pull off strength ≥ 1.5 N/mm².
  • Substrate must be dry with < 6 % moisture and prepared mechanically to achieve an open textured surface.
  • Substrate must be free of standing water and all contaminants such as dirt, oil, grease, coatings, laitance, surface treatments and loose friable material/

 

Step 2 : Mixing

  • Mix Sikalastic®-110 manually or use a low speed mixer until it is completely homogeneous prior to application.

 

Step 3 : Application

Standard Coating System

  • Dilute Sikalastic-110 with 1 part of clean water.
  • Stir gently until the mix is homogenous and uniform colour is achieved.
  • Apply a layer of diluted Sikalastic-110 onto the substrate using a short hair wool roller, brush or airless spray; and leave the primer to dry before applying the first coat.
  • After primer is dried, apply another two layers of Sikalastic-110 to the desired film thickness. 
  • Leave the whole system to cure for around 48 hours prior to overlaying with cementitious screed.

 

Reinforced Coating System:

  • Dilute Sikalastic-110 with 1 part of clean water.
  • Stir gently until the mix is homogenous and uniform colour is achieved.
  • Apply a layer of diluted Sikalastic-110 onto the substrate using a short hair wool roller, brush or airless spray; and leave the primer to dry before applying the first coat.
  • Apply first coat of Sikalastic®-110 and embed Sika® Reemat® Premium-120 onto the wet coating, roll to ensure there are no bubbles or creases.
  • The overlap between the edges shall be minimum 50mm and borders overlap by minimum 100mm.
  • Next, apply an additional 2 coats of Sikalastic®-110 at desired film thicnkess.
  • Leave the whole system to cure for around 48 hours prior to overlaying with cementitious screed.

 

Step 4 : Cleaning of Tools

  • Clean all tools and application equipment with water immediately after use. Hardened and/or cured material can only be mechanically removed.

 

Click Here to View Product Data Sheet

bottom of page